Air Bubble Film Machine 400kg/h output Bubble Wrap Machine DYF-1800
Product Details:
Place of Origin: | China |
Brand Name: | Vinot Brand |
Certification: | CE certificate |
Model Number: | DY-2000 |
Payment & Shipping Terms:
Minimum Order Quantity: | 1-3 set |
---|---|
Price: | The Best Price |
Packaging Details: | Wooden Carton with Wooden Pallets |
Delivery Time: | within 30 days after 30% payment in advance |
Payment Terms: | L/C, T/T |
Supply Ability: | 50-100 Set |
Detail Information |
|||
MATERAIL: | STAINLESS STEEL | Output: | 120 - 190kg / H |
---|---|---|---|
SCREW MATERIAL: | SACM-65/38CRMOLA | Condition: | New |
Main And Auxiliary Extruder Electrical Power: | 100-180kw | Main Bubble Specification: | 6 X 3.2mm 30*10mm |
Product Description
Air Bubble Film Machine 400kg/h output Bubble Wrap Machine DYF-1800
High Production
Wider Air Bubble Film Making Machine
at Low Price
Model No. DYF-1800
Characteristic
Bubble Wrap Machine adopts once-through shaping technique, thus has high efficiency and excellent product quality.Bubble Wrap Machine set has such features as scientific and reasonable structure design, smooth and reliable running and convenient operation and maintenance.
Polyethylene air-cushion film (also called polyethylene bubble film), which is divided into two kind: ordinary polyethylene air-cushion film and composite polyethylene air-cushion film, is a kind of packing material which has been widely used at present.It not only has good cushioning effect, shock resistance and heat-sealing performance, but also has such advantages as good corrosion resistance and transparency , etc.So it has been widely used for packing, household wares, post parcel, bicycle , polyurethane furniture, etc.
Optional Equipment:
1) Auto loader
2) Auto dry hopper
3) Quick screen changer
4) Hydraulic net changer
5) Air shaft
6) gule pump
7). Auto edge recycling system.
8). Auto roll changer
Machine layout
Main parameter
|
Details Picture :
Addition Information
Price Validity: one months since the price offering day |
Payment Terms: 30%T/T before production, 70%T/T before delivery |
Delivery Terms: within 30 days after receipt of 30% deposit |
Production Lead-time: 7-30 days |